Reserved Capacity · Planning

See who genuinely has room for the next project.

Autotask holds every ticket and task your team is assigned, each with the hours it's estimated to take. Your planning board shows the work that's already scheduled. Reserved Capacity connects the two: it takes the assigned work that hasn't become a service call yet and packs it into each resource's day, so the capacity you plan around reflects everything on their plate, not only what's on the calendar.

Let Proxuma do the planning

Estimated hours from assigned tickets and tasks are automatically allocated across future capacity, revealing resource demand before work is scheduled.

A weekly capacity chart, 27 to 31 July, total hours for all resources, each day stacks a navy planned layer, an amber reserved layer and a green spare layer, with the planned, reserved and actual-spare percentages labelled on each segment.

A week across the whole team. Navy is planned hours, amber is reserved task and ticket hours, green is what's genuinely free to take on new work.

Watch · 6 min

See it work in a live plan.

A short walkthrough of Reserved Capacity in a live plan: who has time for a project task, where the reserved hours come from, and how to clear overdue work in Resource Insights.

The Reserved Capacity walkthrough, paused on the capacity view.

The gap it closes

Assigned work and scheduled work live in two layers.

A ticket starts as assigned work: it has an owner, an estimate, and a deadline. It becomes scheduled work the moment someone turns it into a service call with a time on the calendar.

The in-between

Between those two states the hours are real but uncommitted. An engineer can be carrying 15 hours of assigned tickets that haven't been scheduled yet, so a day that looks open on the calendar isn't actually open.

Reserved Capacity takes estimated work directly from Autotask and models it against each resource's available hours. The result is an amber layer that exposes upcoming demand before it enters the schedule.

A single day for one resource: a scheduled Management Meeting appointment, then a RESERVED divider, then a Wireless Installation ticket with an overdue red dot and its progress and deadline.
One day, one resource, the meeting is scheduled; below the RESERVED line, an assigned ticket the algorithm has packed in.

The capacity bar

Five layers, one honest number.

With Reserved Capacity on, every resource's bar breaks into five readings, planned, reserved, spare, actual spare and actual. Each answers a different question about the day.

Looks free

5h

Capacity minus scheduled service calls. The number planning boards have always shown.

Genuinely free

2h

Capacity minus service calls and reserved work. The hours you can actually promise to something new.

How it works

How the reserved layer gets built.

The calculation updates automatically whenever underlying data changes, adjusted estimates, moved service calls, or reassigned work. The board always reflects the latest state when you open it.

  1. 1

    Gather

    Collect eligible work

    Every open ticket and task with hours still remaining goes into the pool. No estimate? It sits out, unless you set a fallback default.
    Replace failover switch10h Wireless install6h MFA rollout4h Pool to place 20h
  2. 2

    Order

    Sort by urgency

    Overdue first, then the earliest deadline, then your work-type priority, so the most pressing work claims time first.
    1 Replace failover switch Overdue · Jan 1 2 MFA rollout Due Jan 15 3 Wireless install Due Feb 4
  3. 3

    Subtract

    Pack into spare hours

    Every tile is a full 8-hour day. Planned work holds its space; the pool packs into the hours left over, today onward, until it runs dry.
    Mon 5h + 3h Tue 3h + 5h Wed 5h + 3h Thu 4h + 4h Fri 5h + 3h Planned Reserved Each day totals 8h, 18 of the pool's 20h land this week, the rest rolls forward to the next spare hours.
  4. 4

    The payoff

    Out comes the answer

    The reserved layer on every bar, an expected-completion date for each item, and a flag the moment work won't fit before its deadline.
    Wednesday, Jan 15, the bar, now built 3h · Planned 3h · Reserved 2h · Free Expected completion Replace failover switchDue Jan 1 Jan 15 MFA rolloutDue Jan 15 Jan 15 Wireless installEnds Feb 4 Feb 6

Stacked View

Committed and uncommitted work, on one board.

The Stacked View renders the algorithm's output into a planning board. Scheduled service calls and reserved items share one day-based grid, no switching between the calendar and a ticket list to see the whole picture.

The weekly Stacked View across a team, each day stacks a capacity bar, scheduled service-call cards, then reserved task and ticket cards below a RESERVED divider.

Each day stacks a capacity bar, the scheduled service calls, then the reserved items below the amber RESERVED divider.

Service calls, committed

Solid border, full entity color, fully draggable. Move them between days and resources exactly as you do on the Regular view.

Reserved items, a forecast

Dashed border, muted color, read-only. Each shows allocated-vs-estimated hours, expected completion, SLA and a status dot. Click to open the ticket; you can't drag it, but right-click to instantly plan it for that day's remaining hours.
● Read-only by design

Why reserved cards don't move

A reserved item is a simulation, "here's what your workload looks like if nothing changes", not a commitment. Keeping it read-only protects the forecast from accidental edits.
One right-click commits it. Right-click a reserved card to plan the service call on the spot, the task or ticket jumps from the amber reserved layer up into the blue planned layer, scheduled for exactly the hours you had left in that day. No form, no drag, no switching screens.

Reading the status dot

  • Green, on track. Expected completion lands before the deadline.
  • Amber, at risk. Expected completion is past the deadline, but the deadline hasn't arrived yet.
  • Red, overdue, or the work can't fit before the deadline at all.

Resource Insights

Every capacity problem, gathered in one place.

What Resource Insights shows

With Reserved Capacity on, Resource Insights pulls every overdue, at-risk and un-estimated item across the team into one screen, each one showing its expected completion date right beside its deadline.

Sidebar

Dots that warn early

Each resource carries red, orange and amber dots for overdue, at-risk and un-estimated work. Click one to open Insights pre-filtered to that resource.

Inline

Edit without leaving

Double-click any row to change its resource, due date, priority, estimate or status right in the table, no opening each item.

Bulk

Clear a backlog fast

Select many items and open Bulk Edit to reassign, reschedule or restatus them in a single pass. Triage a weekly planning meeting in minutes.

The Resource Insights screen: Overdue, At risk and No estimate filters, a Tasks (11) and Tickets (67) switch, and a table of tasks with estimated hours and project, three rows selected.
Filter by Overdue, At risk or No estimate; switch between tasks and tickets; then act on rows together.

Configuration

Tuned to how your team actually works.

Reserved Capacity stays off until you switch it on, and every input is yours to set in Settings General.

The Reserved capacity settings panel in Settings → General, an Enable reserved capacity toggle, a Work type priority dropdown set to Tasks First, a Calculation period dropdown set to 12 months with a note that longer periods take longer to calculate, and Default ticket hours and Default task hours fields used when no estimate is set.

Settings General. Switch it on, pick which work type packs first, set how far ahead to plan, and add fallback hours for items with no estimate.

37

items excluded, no estimate

Settings shows exactly how many tickets and tasks are left out for missing hours. Fill the gaps with Bulk Edit and the forecast sharpens: better estimates, more accurate dates, more trust in the board. The loop pays off the more you use it.

What changes

The same Monday, planned two ways.

Planning by the calendar

What looks free

  • Two resources read 50% free, so the new project goes to them.
  • Those "free" hours were really 30 hours of unscheduled tickets.
  • By Wednesday three deadlines slip, with no warning.
  • Friday is spent in damage control.

Planning by reserved capacity

What's actually free

  • The amber layer shows the "50% free" resource is really at 90%.
  • Actual spare points to the two resources with genuine room.
  • Monday's red and amber dots flag two at-risk items early, one reassign clears the risk.
  • The client gets a delivery date backed by an expected-completion forecast, not a guess.

Reserved Capacity doesn't add work to your team's plate, it surfaces the work that was already there, in time to plan around it.

Get started

Plan around what's actually free.

Reserved Capacity ships with every Proxuma plan. Free 14-day trial, no minimum purchase, no onboarding fee, get a live walkthrough or watch the recorded demo on your own time.