Introduction

Planning work efficiently and effectively can be done in different ways, but which way is the best practice? From the MSP/Autotask consultants at Dxfferent working together with Proxuma, we have created an ideal scenario for any MSP working with Proxuma.

Required Information

To plan well, we need information. Depth of information is dependent upon how far one wants to go  in planning work. So before we determine what information is needed, first the question arises:

"what do you want to achieve by planning? What are your short- and long term goals?"

We can then divide those questions further into smaller questions:
  • What type of work do you want to plan?
    • Tickets
    • Projects/Tasks
    • Shifts
    • Other work
  • What insight do you want to obtain and for whom?
    • Insight into future capacity: Where are the gaps? How busy is my team? When can I promise new projects? What can I commit to when a customer is in the RFP stage? When can we implement changes? When can I plan certain types of tickets requiring certain skills?
    • Looking back: how busy were we? How many hours were billable? What work was planned vs ad-hoc?
  • How much control do you want from management?
    • Do you want to be fully in control and allow dispatchers and project managers to plan everything for the engineers?
    • Do you want to move all work to the service desk and let employees plan their own work?
    • Are you somewhere in between?
  • How do you handle incoming work?
    • Do you reserve a certain number of hours per day for each team, department and job?
    • Do some people work off a queue, or on the basis of priority or SLA?
    • Do these jobs also get planned?
  • What teams, departments and jobs are there?
    • How much of each persons’ time can be planned in advance?
    • How many hours per day do you reserve for ad-hoc work?
  • How do you intend to plan work? To what detail and granularity do you go?
    • Do you plan on a task/ticket level?
    • If so, service calls are the way to go.
  • How much needs to be planned?
    • For this, do you use estimated hours on tasks and tickets?
    • Do you maintain a standard procedure?
  • What is the availability of your staff?
    • What days do they work on?
    • How many hours per day are they available.
  • What people are right for which types of work?
  • Where are we now?
  • Where do we want to be within a year?
  • What is the ideal scenario? What do we strive for?
The ideal scenario we want to strive for is that all the incoming work is immediately handled by the right person, it gets the attention it deserves and we reach out as much as possible upon receiving, working on and solving the issue. Whatever remains, we plan.   We do the above to have as small a backlog as possible and give the customer the best possible experience.
  • A small stockpile of work to be done saves time. The stockpile needs to be managed by people, and it remains in the minds to the engineers involved. Every time they pick it back up again, they go in cold and have to read up on the issue again. The customer needs to be kept in the loop, perhaps contacted as well and meetings may need to be setup. All this takes time, which we minimize by again maintaining a small stockpile of deferred work.
  • Aside from this, customer satisfaction is highest when issues get resolved immediately. When it can’t customers get the next best thing which is a clear date and time for when their issue gets looked into in depth. With Proxuma, the service call and outlook calendar item get created instantly, you can then invite the customer to the calendar item if you want to keep them in the loop.
  Of the work needing to be planned, we know how much time we need to plan, who we need for this and what skills are needed. The work to be planned has already been picked up by the right person. For this the estimated hours are entered into the ticket and we know exactly what is to be planned and what is to be done immediately. The status of the planned item is changed to "schedule" or is planned right away by the right person, either a dispatcher or a knowledgeable employee.   Simple tickets can be planned by the last engineer who worked on it by creating a service call and changing the status to "planned". The remaining tickets get their status changed to "schedule" with an indication as to who best to work on it, either naming the person, skill or type of work. Based on the "schedule" status the dispatcher can assign it to the right person by planning the service call. The work then gets planned at the first convenience into the dispatch calendar and outlook of the most appropriate person to do the job, for the amount of time indicated by the ticket’s estimated hours.   For determining estimated hours we can preconfigure certain things in Autotask:
  • Default estimated hours based on ticket category (as a condition you do need to have a category for everything that comes in). Here you enter a default value of how many hours a ticket should take (either an accepted maximum or an average).
  • Further configuration using form templates. Frequently occurring incidents, changes, requests or other questions are cast into form templates with all the added advantages. That way you are even more accurate in your estimated hours.
  • Any outliers are estimated by the engineer who last worked on the ticket.
  The estimated hours aren’t only necessary to be able to plan well, but also give you directly the possibility to course correct when more hours are spent on average on certain categories of tickets, for instance through dashboards or via notifications that are triggered by a workflow (actual hours exceeds estimated hours).   Now the work is planned, all we need to make sure of now is that everybody knows what needs to be done. You do this by placing a clear instruction in the planned item with checklists or other instructions in the description.     On the basis of the planned work your organizational capacity can be determined. We do need the input per employee for this, however. You’ll need to determine per employee how many hours they are available, possible determined by a work roster. In there, you may record how many hours per employee are dedicated to planned work. Usually, the more senior the engineer, the more of their day consists of planned work (escalated tickets and project tasks).   For the people who work on the servicedesk or who are scheduled for certain shifts, like morning, afternoon or evening shifts, more leeway needs to be given for ad hoc work. So a smaller amount of hours can be given to planned work.   These settings in combination with planned work give you a picture of the future capacity for planned work in the organization.   Because you now have this birds-eye long term view, you can see:
  • How busy everyone is.
  • When you need to hire new employees and with what skills.
  • Determine when work is to be planned. This mostly pertains to tickets and projects, but can be expanded into other types of work as well.

Moving Towards the Ideal Scenario

Getting towards the ideal scenario as an MSP you will presumably have to take quite a few steps, depending upon your stage of maturity towards a planned work organization. Below we provide a set of steps to get to the ideal scenario.  
  1. Map out and describe all your processes, so you know how they all work together and people in the organization know what is expected of them.
  2. Define for each process what is a ticket, and what category the ticket is to fall under. Here, make sure you have the right process for determining estimated hours.
  3. Create form templates for the most frequently occurring tickets for each category. populate all the defaults and estimated hours.
  4. Instruct everyone to enter the estimated hours. You can make this a quick ticket edit field in time entries or notes.
  5. Describe your dispatching process, along with who will plan and what information should be added where upon planning. For this you can also create a form template.
  6. Train employees on the basis of the right processes. Keep coaching on this.
  7. Make a dashboard for the dispatcher and for the employees regarding their work to do.
  8. Start planning using service calls.
  9. Start using Proxuma to get the full benefit of planned work.
  10. Setup the capacity for each employee in Proxuma.
  11. Use Project Proposals to conceptualize your project pipeline.
  12. Introduce your process for handling incoming work, with therein the right choices and settings and everything else that touches the organization. Don’t underestimate this step as it will imply a cultural shift.