What better planning is worth
to your MSP

Three places where planning quality turns into money. Move the sliders to match your team: every number below updates instantly.

These are estimates, built on published industry benchmarks. Every assumption is listed below

Your team

15
3 60
2
1 8
€55
€30 €120
€110
€50 €220
4
1 20
€15.000
€2.000 €100.000

Estimated annual value €131.388 / year

Planning & PM time back

€24.288/yr

9.6 planning hours back per week across 2 planners, at €55/h.

Billable capacity opened up

€99.000/yr

+3 utilization points on 15 engineers ≈ 900 extra billable hours at €110/h.

Projects kept in budget

€8.100/yr

30% of projects miss budget (PMI 2025); assume a 15% overrun, 25% of it recovered.

Estimated annual value

€131.388 / year

€24.288 of this is planner and PM time back, valued at cost; the other €107.100 is revenue-side value that lands only if the extra hours and projects are sold and delivered. Before Proxuma's subscription cost, which you can build on the pricing page. Your real numbers will differ. That's what the trial is for.

Planning hours back: 9.6 h/week Extra billable hours: 900 h/year

That figure is a model built on your slider settings. In a 15-minute demo we put it next to your own Autotask data, no slides.

How we calculate this: every assumption and source

These are estimates, not promises. Each lever uses a conservative multiplier taken from published industry research or from what Proxuma customers report. We have also interviewed our own customers about where planning time actually goes, and used those conversations to tune the defaults. Those were ordinary customer conversations, not a formal or recorded study, so no number here rests on them alone. Where solid public data doesn't exist, we say so and use a deliberately low default. Judge the model, then test it against your own numbers in a trial.

1 · Planning & PM time back planners × 12 h/week scheduling × 40% saved × cost per hour × 46 weeks The 12 h/week is an assumption. Adjust it to your reality. Published "15 hours a week lost to manual scheduling" figures all trace back to vendors selling scheduling software, so we deliberately use less. The 40% saved is conservative against what Proxuma customers report: a dispatch prepared in 20 minutes instead of two hours, and a PM at a 25-person MSP getting an hour a day back. For reference, Eurostat puts total hourly labour cost in the Dutch information and communication sector at €58,00 for 2024, against an EU27 average of €48,20 for 2025. That is wages plus employer social contributions, the same salary-plus-overhead basis this slider asks for, so the €55 default sits between the two.
2 · Billable capacity opened up engineers × 2,000 h/year × +3 utilization points × billable rate SPI Research’s 2025 Professional Services Maturity Benchmark measured average billable utilization at 68.9%, against the 75% SPI calls the optimal threshold: a 6.1-point gap. We assume better planning recovers 3 of those points, about half the gap, and we use SPI’s own 2,000-hour utilization year. Note this is extra revenue capacity, not profit: it only lands if you can sell the hours.
3 · Projects kept in budget projects per year × average budget × 30% miss budget × 15% average overrun × 25% recovered PMI Pulse 2025: 27 to 32% of projects miss their budget. The 15% average overrun size is our assumption, far below the famous McKinsey/Oxford 45%, which covered $15M+ programmes back in 2012 and doesn’t fit MSP-size projects. Recovering a quarter of that overrun through earlier signal and tighter resource planning is the assumption you’re buying.