What better planning is worth
to your MSP
Three places where planning quality turns into money. Move the sliders to match your team: every number below updates instantly.
These are estimates, built on published industry benchmarks. Every assumption is listed belowYour team
Estimated annual value €131.388 / year
Planning & PM time back
9.6 planning hours back per week across 2 planners, at €55/h.
Billable capacity opened up
+3 utilization points on 15 engineers ≈ 900 extra billable hours at €110/h.
Projects kept in budget
30% of projects miss budget (PMI 2025); assume a 15% overrun, 25% of it recovered.
Estimated annual value
€24.288 of this is planner and PM time back, valued at cost; the other €107.100 is revenue-side value that lands only if the extra hours and projects are sold and delivered. Before Proxuma's subscription cost, which you can build on the pricing page. Your real numbers will differ. That's what the trial is for.
That figure is a model built on your slider settings. In a 15-minute demo we put it next to your own Autotask data, no slides.
How we calculate this: every assumption and source
These are estimates, not promises. Each lever uses a conservative multiplier taken from published industry research or from what Proxuma customers report. We have also interviewed our own customers about where planning time actually goes, and used those conversations to tune the defaults. Those were ordinary customer conversations, not a formal or recorded study, so no number here rests on them alone. Where solid public data doesn't exist, we say so and use a deliberately low default. Judge the model, then test it against your own numbers in a trial.
Where to next
This page stops at the value. Here is the rest of the picture.